Russia, Mytishchi District, Moscow region
Mosenergo JSC
2007-2008 гг.
450 MW
In 2007 within the framework of executing “Moscow electric power system development and technical upgrading program for 2006–2020” Stroytransgaz PJSC concluded a contract with Mosenergo JSC to perform a complex of operations to build the fourth energy block of the combined-cycle plant CCP-450T at TPP-27. TPP-27 is located in Mytishchi District, Moscow region. Its electrical output is 450 MW.
Following the project STG performed the following operations:
Technical up-grading allowed increasing efficiency of TPP-27, decreasing fuel consumption and improving environmental characteristics of the plant.
The operations were completed in 2008.