Russia, Moscow Region
Tsentravtomagistral FKU
2014-2020 гг.
5.4 km
6
In September 2014 PJSC STG won the tender and entered into the general contractor contract for construction and reconstruction of the motor road sections A-104 Moscow - Dmitrov - Dubna. The Customer is Tsentravtomagistral FKU.
In accordance with the contract, STG shall construct and reconstruct 5.4 km of the A-104 high-speed highway to the total. The work will be performed at sections (km 23+500 - km 24+200, km 26+1080 - km 29+600) in the territory of Mytischi municipal district and Dolgoprudny, Moscow region. STG shall enhance the road from 4 to 6 lanes (3 to each direction) and shall construct additional lanes for exit to the adjacent territories. The reconstruction project shall allow increasing the capacity of overloaded road sections.
The scope of STG also includes: